Add an option to the MI scheduler to cut off scheduling after a fixed number of
instructions have been scheduled. Handy for tracking down scheduler bugs, or
bugs exposed by scheduling.


git-svn-id: https://llvm.org/svn/llvm-project/llvm/trunk@153045 91177308-0d34-0410-b5e6-96231b3b80d8
1 file changed