Move net unit tests to packages/Connectivity

Move the tests together with packages/Connectivity code, so both can be
moved to packages/modules/Connectivity together.

Also reorganize unit tests in a unit/ directory, as other tests
(integration/, common/ etc.) have been added in tests/net since they
were created. This makes the directory structure consistent.

Test: atest FrameworksNetTests
Bug: 187814163
Ignore-AOSP-First: needs per-branch move for merge conflicts
Change-Id: I254ffd1c08ec058d594b4ea55cbae5505f8497cc
147 files changed
tree: 4f28b1c657b483beb00c0b9a1b33d56721fba4e1
  1. framework/
  2. service/
  3. services/
  4. test/
  5. tests/
  6. OWNERS
  7. TEST_MAPPING